Who Builds the Compute: An AI Workforce Data Book

Job postings, AI workforce supply, locations and employers for the people who build, power, cool and program data centers. Compiled from Draup talent intelligence, October 2026.

As AI infrastructure investment grows across the US, the AI workforce that builds, powers, cools and programs data centers is in demand. This data book follows the AI talent trends in that workforce, from electrical and cooling trades to semiconductor and compute software roles, and shows where the war for talent is concentrated.

Evidence base: Draup US job postings·Draup professional profiles·Window: September 2024 to September 2026

Authors

✦Built with the Draup Talent connector in Claude and Curie Deep Research; reviewed by Draup’s research team.

Electrical and power roles

+0%

Change in monthly postings, Sep 2024 to Sep 2026

Cooling and mechanical roles

+0%

Change in monthly postings, Sep 2024 to Sep 2026

Technician postings open to three years or less

0%

Of postings with a stated requirement

Main points: AI workforce trends at a glance

01

Posting growth by group, 2024 to 2026

Between September 2024 and September 2026, monthly US postings for each group changed as follows: electrical and power +230%, cooling and mechanical +195%, compute software +89%, semiconductor +15%.

02

Early-career demand for data center technicians

Employers hiring data center technicians mostly accept early-career candidates: 84% of technician postings with a stated requirement ask for three years or less. Only 12% of the US technician profiles on record have three years or less.

03

Experience of the existing trades workforce

The people already working in these trades skew experienced. 35% of HVAC technician profiles and 41% of electrical engineer profiles show fifteen or more years of experience, against 16% for machine learning engineers.

04

Data center share of postings in newer hubs

Data center roles make up most of the postings in the newer hubs: 96% in Columbus and 94% in Reno, against 46% in the San Francisco Bay Area.

05

Metros with data centers under construction

15 of the 22 US metros in the charts have data centers under construction in the metro or the wider region. Boston has proposals only, and New York has a state permitting pause.

06

Construction status and posting growth

15 of the US metros shown have data centers under construction, led by Atlanta (2,882 MW) and Northern Virginia (2,420 MW) in CBRE’s first-half 2026 report. Growth in data center postings does not line up neatly with that status: the median two-year change is +125% where construction is under way, +166% where projects are planned or proposed, and +80% where none was identified. Houston (+603%) grew most among the larger markets, and Abilene’s rise starts from just 3 postings in September 2024.

07

Where data center talent is moving

Data center talent is moving toward metros where construction is under way. 8 of the 11 such metros with enough data gain more data center talent than they lose, against 0 of 2 where no under-construction project was identified. Adjusted for workforce size, the largest gains on the Talent Flow Index are in Abilene (+100) and Hermiston-Pendleton (+40), and the largest losses are in Houston (−28) and Chicago (−25).

08

Employers of electrical, cooling and software roles

5 of the ten largest employers of electrical and cooling roles are engineering, construction, real estate services or equipment companies. None of the ten largest employers of compute software roles fall in those categories (0).

How exposed is your own AI workforce plan?

The data book shows where AI workforce demand is growing. The diagnostic shows which roles and tasks in your organization AI changes first.

SCOPE AND DEFINITIONS

The Data Center Workforce

This data book covers four parts of the AI workforce that builds and runs large-scale computing: constructing and commissioning data centers, operating them (data center operations, run by data center operators and technicians), producing the chips inside them, and writing the software that runs on top. Each group is identified from job-title keywords. That makes the groups easy to reproduce, but titles are an imperfect guide, and the limits are listed in the method section.

Role groups and the title keywords that define them

Group
What it covers
Title keywords
Data center electrical and power
Electrical engineers, electricians, switchgear, generator and low-voltage roles at data centers
“data center” or “datacenter” plus electrical, electrician, low voltage, switchgear, generator or power
Data center cooling and mechanical
HVAC, chiller, thermal and mechanical roles at data centers
“data center” or “datacenter” plus hvac, cooling, mechanical, chiller, thermal or cfd
Data center construction and commissioning
Project managers, superintendents, commissioning and project engineers
“data center” or “datacenter” plus construction, project manager, superintendent, commissioning or project engineer
Data center technicians
Technician roles in operating facilities
“data center” or “datacenter” plus technician
Semiconductor
Chip fabrication, wafer processing and advanced packaging
semiconductor, wafer, lithography, cleanroom, advanced packaging, fab technician or fabrication technician
Compute software
Software and platform engineering for machine learning and high-performance computing
MLOps, AI platform, AI infrastructure, ML infrastructure, machine learning infrastructure, GPU, HPC or high performance computing

DEMAND

Hiring Trends for 2026 and Which Groups Are Growing

Job postings show what employers are trying to fill. They do not show how many people were hired. This section compares the number of US postings each group had in September 2024, September 2025 and September 2026, to show hiring trends for 2026 against earlier levels.

The headline measure is the change in monthly postings between two single months, with each year shown separately. Total US postings in the data were lower in September 2026 than in September 2024, so each group’s share of all US postings, shown as a secondary view in the table, rises by more than its raw count. For the data center groups, most of the growth came in the first year. Read together, the figures are an early look at future workforce trends for AI infrastructure.

Electrical and power

+0%

Change in monthly postings, Sep 2024 to Sep 2026

Cooling and mechanical

+0%

Change in monthly postings, Sep 2024 to Sep 2026

Compute software

+0%

Change in monthly postings, Sep 2024 to Sep 2026

Monthly postings, indexed to Sep 2024 = 100

100200300400500600700Sep ’24Dec ’24Mar ’25Jun ’25Sep ’25Dec ’25Mar ’26Jun ’26Sep ’26Electrical & power 330Cooling & mechanical 295Construction 283Compute software 189Semiconductor 115
Electrical & power
Cooling & mechanical
Compute software
Construction and semiconductor

Each month’s US postings divided by the September 2024 postings, times 100. Hover the chart to see each month’s values.

Source: Draup job postings, US, September 2024 to September 2026.

Electrical and power, cooling and mechanical, and construction roles all grew far faster than compute software roles. Semiconductor and technician roles grew the least. Because the comparison uses single months, a few postings can move the figures, so read the line chart as well as its end points.

Change by group

Group
Postings, Sep 2024
Sep 2025
Sep 2026
Two-year change
Year one
Year two
Share per 100k, Sep 2024
Sep 2026
Change in share
Data center electrical and power
164
475
542
+230%
+190%
+14%
3.3
13.7
+320%
Data center cooling and mechanical
122
352
360
+195%
+189%
+2%
2.4
9.1
+275%
Data center construction and commissioning
512
1,471
1,449
+183%
+187%
−1%
10.2
36.6
+260%
Compute software (ML platform, GPU, HPC)
1,100
2,036
2,079
+89%
+85%
+2%
21.8
52.5
+140%
Data center technicians
1,080
1,593
1,300
+20%
+48%
−18%
21.5
32.8
+53%
Semiconductor
1,301
1,497
1,490
+15%
+15%
0%
25.8
37.6
+46%

Year one is September 2024 to September 2025 and year two is September 2025 to September 2026. The last three columns are the secondary view: each group’s share of all US postings. Technician postings spike in March 2026 because of bulk postings; that month is not part of the comparison.

Source: Draup job postings, US, September 2024 to September 2026.

EXPERIENCE

What Employers Ask For and What the Workforce Has

Two views of experience are shown here. The first is the minimum experience employers ask for in job postings. The second is the experience of US professionals who currently hold these roles, taken from Draup’s profile data.

Experience asked for in postings

Among postings that state a minimum, the share asking for three years or less and the share asking for five or more.

Three years or less
Five years or more
Data center techniciansMedian asked: 2 years
84%
12%
SemiconductorMedian asked: 4 years
49%
47%
Data center cooling and mechanicalMedian asked: 5 years
31%
62%
Data center electrical and powerMedian asked: 5 years
27%
69%
Compute software (ML platform, GPU, HPC)Median asked: 5 years
20%
73%
Data center construction and commissioningMedian asked: 5 years
20%
76%

Source: Draup job postings, US, September 2024 to September 2026.

For data center technicians the two views do not line up, which points to an experience gap inside the wider AI skills gap. 84% of technician postings with a stated requirement ask for three years or less, while 12% of the 12,997 US technician profiles in the data show three years or less. The early-career group is a small part of the technician profiles in the data.

US workforce on record, by role

Role
US profiles
Median years of experience
Three years or less
Fifteen years or more
Mechanical Engineer
139,772
12.1
5%
38%
Electrical Engineer
79,141
12.6
5%
41%
Network Engineer
71,949
16.9
2%
57%
HVAC Technician
23,132
11.7
6%
35%
Data Center Technician
12,997
8.3
12%
20%
Data Center Engineer
7,590
13.7
5%
45%
HVAC Engineer
3,410
14.1
4%
46%
Machine Learning Engineer
30,808
9.0
7%
16%
Machine Learning Operations (MLOps) Engineer
1,109
10.1
3%
21%

Profile data covers people who keep an online professional profile. It under-represents skilled trades, so the counts show the relative size of the visible workforce and not total employment. Electricians do not appear because the profile data has no standard electrician role.

Source: Draup professional profiles, US.

LOCATIONS

Where AI Infrastructure Investment Meets Hiring

Postings are counted by US metro area and split into two kinds of titles: data center titles, which cover the physical build and operation, and compute software titles. The two kinds cluster in different places. Data center roles make up 96% of the postings in Columbus and 94% in Reno, against 46% in the San Francisco Bay Area, where software titles lead.

Each metro below is flagged for data center construction, a sign of AI infrastructure investment, and shows how much its data center postings grew. Of the metros shown, 15 have data centers under construction, 5 have projects planned or proposed, and 2 had no under-construction project in the sources checked. Growth is the change in a metro’s monthly data center postings, excluding technician roles, from September 2024 to September 2026. Small metros start from small counts, so their percentages swing widely. Hover a row to see the evidence behind its flag.

Largest US markets

Data center titles
Compute software titles
Metro and construction status
Data center vs software postings
Data center share
Change in data center postings
Washington DC metroUnder construction
79%
+48%
San Francisco Bay AreaUnder construction
46%
+193%
Dallas-Fort WorthUnder construction
90%
+226%
Greater New YorkNone identified
67%
+94%
Greater AtlantaUnder construction
92%
+125%
Columbus OHUnder construction
96%
+66%
AustinPlanned or proposed
70%
+207%
Greater SeattleNone identified
66%
+66%
PhoenixUnder construction
94%
+42%
Greater ChicagoPlanned or proposed
84%
+115%
BostonPlanned or proposed
62%
+135%
DenverPlanned or proposed
86%
+166%

Smaller hubs

Metro and construction status
Data center vs software postings
Data center share
Change in data center postings
HoustonPlanned or proposed
79%
+603%
Richmond VAUnder construction
92%
+131%
Salt Lake CityUnder construction
80%
+59%
Reno NVUnder construction
94%
+172%
Des Moines IAUnder construction
92%
+80%
Omaha NEUnder construction
97%
+134%
Abilene TXUnder construction
100%
+2767%
Jackson MSUnder construction
93%
+238%
Hermiston-Pendleton ORUnder construction
100%
+73%
Cheyenne WYUnder construction
91%
+55%

The Washington DC metro includes Northern Virginia. Counts cover US postings from September 2024 to September 2026.

Source: Draup job postings, US, September 2024 to September 2026. Construction flags: Draup signals, CBRE, Baxtel, Epoch AI.

Where demand is growing and where data centers are being built

Each bubble is a metro. Right of the dashed line, data center postings grew. Higher up, the metro posts more data center roles each month. Bubble size also shows monthly postings, and color shows construction status. Houston grew by more than the chart’s edge, so it sits at the right-hand side.

Under construction
Planned or proposed
None identified
0%+100%+200%+300%30100300Change in monthly data center postings, Sep 2024 to Sep 2026Postings per month, Jul to Sep 2026 (log scale)Washington DC metroSan Francisco Bay AreaGreater AtlantaAustinColumbus OHGreater SeattlePhoenixGreater ChicagoHouston (+603%)DenverBostonSalt Lake CityReno NVRichmond VAAbilene TX (+2767%)Des Moines IAJackson MSOmaha NECheyenne WYHermiston-Pendleton OR

Median change in data center postings: +125% where construction is under way, +166% where projects are planned or proposed, and +80% where none was identified. Every metro grew, and the differences between the groups are small next to the spread inside each one, so construction status alone does not predict which metros post more. Bubbles at the right-hand edge are drawn there because their growth runs off the chart; their real figures are in the labels. The last group is two metros: Seattle, which adopted a moratorium on large data centers, and New York, which paused state permitting. With so few metros per group this shows direction, not proof.

Source: Draup job postings, US, September 2024 to September 2026. Construction flags: Draup signals, CBRE, Baxtel, Epoch AI.

TALENT FLOW

Where Data Center Talent Is Moving: Talent Trends by Metro

Draup profile data shows where people who now hold data center roles worked before, a view of AI talent trends in the data center workforce. This section covers people who started a data center role in 2022 or later and whose previous job was in a different metro. Results are shown as indexes, not as headcounts. The main Talent Flow Index compares each metro’s net arrivals, meaning people arriving minus people leaving, with the size of its data center workforce, so a small metro with a large gain scores higher than a big metro with a small one. The largest result is set to plus 100. A second column, the volume index, ignores size and compares net arrivals in people with the largest net gain.

Talent Flow Index by metro, adjusted for workforce size

Under construction
Planned or proposed
None identified
Metro and construction status
Net exporter, adjusted for sizeNet importer, adjusted for size
Index
Volume
Abilene TXUnder construction
+100
+91
Hermiston-Pendleton ORUnder construction
+40
+36
Jackson MSUnder construction
+22
+9
Columbus OHUnder construction
+20
+82
AustinPlanned or proposed
+15
+27
Omaha NEUnder construction
+11
+18
Washington DC metroUnder construction
+9
+100
Greater AtlantaUnder construction
+6
+31
San Francisco Bay AreaUnder construction
+4
+20
PhoenixUnder construction
−2
−9
Dallas-Fort WorthUnder construction
−6
−25
Richmond VAUnder construction
−14
−11
Greater New YorkNone identified
−23
−100
Greater SeattleNone identified
−23
−40
Greater ChicagoPlanned or proposed
−25
−84
HoustonPlanned or proposed
−28
−35

Not scored, because no corridor had enough movers: Boston, Denver, Reno NV, Salt Lake City, Des Moines IA, Cheyenne WY. Hover a row to see where its talent comes from and goes to.

Source: Draup professional profiles, US. Data center roles started in 2022 or later.

Metros with construction under way mostly gain data center talent: 8 of the 11 that have enough data are net gainers, against 1 of 3 where projects are planned or proposed and 0 of 2 where no under-construction project was identified. The two lenses differ. Washington DC has the largest net gain in people (volume index +100) but a modest gain for its size (+9), while Abilene’s gain is large for its small base (+100), which a small base can exaggerate. The pattern is the opposite of the one in posting growth, where metros with construction were not the fastest growing. With few metros in each group, it shows direction, not proof.

Largest corridors

Each bar compares one origin-to-destination corridor with the largest corridor in the data, which is set to 100.

Greater Chicago → Milwaukee100
Dallas-Fort Worth → Abilene TX64
Greater New York → Washington DC metro60
Greater Chicago → South Bend56
Greater New York → Greater Atlanta48
Richmond VA → Washington DC metro48
Sacramento → San Francisco Bay Area48
San Francisco Bay Area → Austin44
Hyderabad (India) → Dallas-Fort Worth44
Dallas-Fort Worth → San Antonio36
Dallas-Fort Worth → Washington DC metro36
Greater New York → Philadelphia36

Corridors between neighboring metros, such as Chicago to Milwaukee, often reflect moves within one region. Hyderabad appears because of one corridor into Dallas-Fort Worth.

Source: Draup professional profiles, US. Corridors with at least five movers.

EMPLOYERS

Who Is Hiring the Data Center Workforce

The war for talent in data centers is not fought by the same kinds of employers in every role group. 5 of the ten largest employers of electrical, cooling and mechanical roles are engineering, construction, real estate services or equipment companies. For compute software, none of the ten largest employers fall in those categories (0); the list is mostly chipmakers and large technology companies, plus a job board.

Ten largest employers by postings

Engineering, construction, real estate services and equipment companies
Other employers

Electrical, cooling and mechanical roles

GoogleTech and cloud
1,205
OracleTech and cloud
894
CBREReal estate and construction services
806
JacobsEngineering and construction
781
Amazon Web ServicesTech and cloud
732
OlssonEngineering and construction
705
WSPEngineering and construction
654
Johnson ControlsEquipment maker
414
Amazon.comTech and cloud
367
JobotRecruiting firm
328

Compute software

NVIDIAChipmaker
2,683
AMDChipmaker
1,641
AppleTech and cloud
1,612
OracleTech and cloud
1,387
GoogleTech and cloud
1,009
Jobs via DiceJob board
802
OpenkyberUnclassified
740
QualcommChipmaker
738
Hewlett Packard EnterpriseTech and cloud
593
MicrosoftTech and cloud
484

Highlighted bars are engineering, construction, real estate services and equipment companies. The employer type is a grouping added for this data book. The compute software list includes chipmakers because the GPU title keyword also matches chip-design roles. Recruiting firms and job boards post on behalf of other employers, so they can hide the real employer.

Source: Draup job postings, US, September 2024 to September 2026.

FAQS

FAQs on the AI Workforce Behind Data Centers

Which AI workforce roles are growing fastest?

Between September 2024 and September 2026, monthly US postings grew +230% for electrical and power roles and +195% for cooling and mechanical roles, against +89% for compute software and +15% for semiconductor.

Is there an experience gap in the data center workforce?

For technicians, yes. 84% of technician postings with a stated requirement ask for three years or less, while only 12% of US technician profiles on record fall in that range.

Where is data center talent moving?

Mostly toward metros where data centers are under construction. Adjusted for workforce size, Abilene and Hermiston-Pendleton show the largest gains, and Houston and Chicago the largest losses.

BOTTOM LINE

Where the AI Workforce Will Come From

Demand for the AI workforce is strongest in the trades that build and power data centers. Electrical, cooling and construction roles grew far faster than compute software, employers accept early-career technicians while the visible workforce skews experienced, and talent is moving toward the metros where data centers are being built. For any organization planning around AI infrastructure investment, the open questions are which roles it will need and which tasks AI will change first.

Ready to plan your AI workforce?

Assess AI readiness at the task level with Etter by Draup.

METHOD

Method, Sources and Limits

Postings, experience, locations and employers. These come from Draup’s job-posting table in the data warehouse, limited to postings located in the United States, for September 2024 through September 2026, queried on October 16, 2026. Job titles are matched on the normalized title field. Counts are postings, not openings or hires, and can include reposts. Growth is the change in monthly postings between September 2024 and September 2026, with September 2025 as the midpoint, and shares of all US postings are a secondary view.

Workforce supply and experience. These come from Draup’s professional profile snapshot, filtered to profiles in the United States that carry the named role, queried on October 13, 2026. A profile can carry more than one role.

Construction flags. Flags come from Draup news signals in the Center Setup and Expansion category, captured from January to October 2026 and searched by metro. CBRE’s North America Data Center Trends H1 2026 report supplies megawatts under construction for its primary markets. Where Draup signals had no coverage, as in Des Moines and Omaha, a public project tracker (Baxtel, Epoch AI) is used and named in the table. Each flag rests on news reporting and has not been checked against permits.

Metro demand growth. For each metro, monthly data center postings in September 2026 against September 2024, excluding technician titles because bulk postings distort them, from the same warehouse table and US filter as the other demand figures. Metros with small counts, such as Abilene, show very large percentages.

Talent flow. The flows come from Draup’s professional profiles. A profile counts when its current position is a data center role (Data Center Technician, Engineer, Operations Manager, Analyst or Director of Data Center Operations) that started in 2022 or later. The origin is the metro of the previous position, which must have ended no more than a year before the new one began. Only corridors with at least five movers are kept, to limit noise. Corridor values are scaled to the largest corridor. Each metro’s net arrivals are divided by the number of data center profiles currently in that metro, and the results are scaled so the largest absolute value is 100. The volume index uses net arrivals alone, scaled the same way. Internal transfers are included.

Limits. Postings are limited to those located in the United States. Titles are a proxy for the work. Electricians hired directly by contractors may not carry “data center” in the title, so electrical roles are probably undercounted in the postings. Overall posting volume swings from month to month, which is why growth is shown as a share of all postings. Metro growth rates for smaller metros rest on counts in the tens to low hundreds a month and move easily. The talent flow index rests on profile data, which under-represents skilled trades, metros without a corridor of enough movers are not scored, and a small workforce base, as in Abilene, can exaggerate the size-adjusted index. Hiring difficulty and talent supply by metro are not included in this edition.