Who Builds Data Centers in the US?
An AI Infrastructure Databook
Why are so many data centers being built, and who is actually building them? Behind every AI data center construction project is a workforce that rarely makes the headlines: electricians, cooling and mechanical specialists, construction trades and compute software teams. This databook maps that workforce using Draup’s job-posting and talent data.
KEY FINDINGS
Who Builds Data Centers?
The electricians, cooling specialists, construction teams and technicians building US data centers, and the employers hiring them.
Electrical and power roles
+0%
Change in monthly postings, Sep 2024 to Sep 2026
Cooling and mechanical roles
+0%
Change in monthly postings, Sep 2024 to Sep 2026
Technician postings asking for three years or less
0%
Of postings that state a minimum
01
Posting growth by group, 2024 to 2026
Monthly US postings rose 230% for data center electrical and power roles, 195% for cooling and mechanical, and 183% for construction and commissioning roles between September 2024 and September 2026, according to Draup's job-posting data. Postings for compute software roles rose 89% and for semiconductor roles 15%.
02
Entry requirements for data center technicians
Entry requirements for data center technicians are low: 21,676 of the 25,946 technician postings that state a minimum (84%) ask for three years of experience or less. Only 2,488 of the 12,887 US technician profiles with recorded experience (19%) show four years or less.
03
Experience of the existing trades workforce
Many people in the related trades have long careers: 35% of HVAC technician profiles and 41% of electrical engineer profiles show 15 or more years of experience, against 16% of machine learning engineer profiles.
04
Estimated size of the US workforce
Draup estimates 352,185 mechanical engineers, 351,467 HVAC technicians and 226,478 electrical engineers in the United States, against 14,417 data center technicians and 9,567 data center engineers across all industries.
05
Data center share of postings by metro
Data center roles accounted for 96% of the relevant postings in Columbus, Ohio, and 94% in Reno, Nevada, against 46% in the San Francisco Bay Area, where software titles lead.
06
Construction status and posting growth
Growth in data center postings does not follow status of data center construction projects. In the 15 of the 22 US metros studied where data centers are under construction, according to Draup news signals and an independent CBRE research, the median two-year rise in data center postings was 125%. It was 166% where projects were planned or proposed and 80% where none was identified. Houston recorded a rise of 603%, the largest apart from Abilene, whose percentage rise reflects a base of just 3 postings in September 2024.
07
Employers of electrical, cooling and software roles
Of the ten largest employers of electrical and cooling roles, five are engineering, construction, real estate services or equipment companies. None of the ten largest employers of compute software roles falls into those categories.
SCOPE AND DEFINITIONS
What It Takes to Build a Data Center
To answer who builds data centers, this data book covers four parts of the work behind large-scale computing: building and commissioning data centers, operating them, manufacturing the chips inside them and writing the software that runs on them. Each group is identified from job titles.
Caveat: A job title doesn’t always tell you what someone does day to day. The method section explains where that limits the analysis.
Role groups and what they cover
DEMAND
Fastest Growing Data Center Jobs
Job postings show what employers are looking for, not who they end up hiring. This section compares the number of US postings in each group in September 2024, September 2025 and September 2026.
The headline measure is the change in monthly postings between two single months, shown for the full two years and for each year separately. Total US postings in the data were lower in September 2026 than in September 2024, so each group's share of all US postings, shown as a secondary measure in the table, rose faster than its raw count.
Electrical and power
+0%
Change in monthly postings, Sep 2024 to Sep 2026
Cooling and mechanical
+0%
Change in monthly postings, Sep 2024 to Sep 2026
Compute software
+0%
Change in monthly postings, Sep 2024 to Sep 2026
Monthly postings, indexed to Sep 2024 = 100
Each month’s US postings divided by the September 2024 postings, times 100. Hover the chart to see each month’s values.
Source: Draup job postings, US, September 2024 to September 2026.
Most of the increase in data center postings came in the first year. Electrical and power postings rose 190% in year one and 14% in year two, cooling and mechanical postings 189% and 2%, and compute software postings 85% and 2%. Semiconductor and technician postings grew least over the two years. Comparisons between single months are sensitive to a small number of postings.
Change by group
Year one covers September 2024 to September 2025 and year two September 2025 to September 2026. The final three columns show each group's share of all US postings. Technician postings spiked in March 2026 because of bulk postings; that month is excluded from the comparison.
Source: Draup job postings, US, September 2024 to September 2026.
EXPERIENCE
How Much Experience Data Center Jobs Require?
Two sources of evidence on experience are compared: the minimum experience employers request in job postings, and the experience recorded on the profiles of US professionals who currently hold these roles.
Experience asked for in postings
Data center technician is the only group in which most postings ask for three years of experience or less. Most electrical, cooling, construction and compute software postings ask for five years or more. Shares are of postings that state a minimum, which include postings asking for three or more years.
Source: Draup job postings, US, September 2024 to September 2026.
The two measures diverge for data center technicians. Among the 25,946 technician postings that state a minimum, 21,676 (84%) ask for three years or less, while only 2,488 of the 12,887 US technician profiles with recorded experience (19%) show four years or less. The measures are not identical, because postings state requirements and profiles record careers, so the comparison indicates direction only.
US workforce on record, by role
Talent size is Draup's estimate of the number of people working in each role in the United States. It combines Draup's professional profiles and job postings with Bureau of Labor Statistics and International Labour Organization data, so it is not limited to people with online profiles. The estimates carry a relative standard error of 5% to 10%. The experience columns are calculated from Draup profiles only, which under-represent skilled trades. For data center technicians the early-career column shows the share of profiles with four years or less, and for every other role three years or less. Electricians are absent because the profile data has no standard electrician role.
Source: Draup Talent Intelligence (talent size); Draup professional profiles, US (experience).
LOCATIONS
Where Data Center Hiring Is Concentrated?
Draup’s data shows that existing Data Center talent has higher median years of experience than what is being asked in new job postings. The high demand for this talent pool is possibly bringing down the years of experience required for these roles. Organizations may also be looking for adjacent talent pools with high experience to make up for the shortfall in the highly experienced data center talent. Postings were counted by US metro area and divided between data center titles, which cover construction and operation, and compute software titles. The two groups cluster in different places.
Each metro is flagged for data center construction and shows the change in its monthly data center postings, excluding technician roles, between September 2024 and September 2026. Of the metros studied, 15 have data centers under construction, 5 have projects planned or proposed and 2 had no under-construction project in the sources reviewed. Metros with small counts start from low bases, so their percentage changes are volatile. The evidence behind each flag is listed in the table at the end of this section.
Largest US markets
The two largest markets by volume differ in mix: data center roles accounted for 79% of relevant postings in the Washington DC metro and 46% in the San Francisco Bay Area, where software titles are more common. Relevant postings are those with a data center or compute software title.
Smaller hubs
Several smaller hubs consist almost entirely of data center roles: they accounted for 99.6% of relevant postings in Abilene and 100.0% in Hermiston-Pendleton.
The Washington DC metro includes Northern Virginia. Counts cover US postings from September 2024 to September 2026.
Source: Draup job postings, US, September 2024 to September 2026. Construction flags: Draup signals, CBRE, Baxtel, Epoch AI.
Metro detail: postings, growth and construction status
Source: Draup job postings, US, September 2024 to September 2026. Construction flags: Draup signals, CBRE, Baxtel, Epoch AI.
Demand growth and construction status by metro
Growth in data center postings was steepest in metros that started from small bases: Houston rose 603% and Jackson 238%, while Washington DC, the largest market by volume, rose 48%. Each bubble represents a metro, positioned by two-year growth (horizontal) and by monthly postings in July to September 2026 (vertical, logarithmic scale). Bubble size reflects that volume and color shows construction status. Houston and Abilene exceed the chart's range and are plotted at its right-hand edge, with their actual changes in the labels.
The median change in data center postings was 125% where construction is under way, 166% where projects are planned or proposed and 80% where none was identified. Every metro grew, and the gaps between the groups are small relative to the spread within each, so construction status does not on its own explain which metros post more. The last group comprises two metros: Seattle, which adopted a moratorium on large data centers, and New York, which paused state permitting. The groups are small, so the pattern is indicative only.
Source: Draup job postings, US, September 2024 to September 2026. Construction flags: Draup signals, CBRE, Baxtel, Epoch AI.
Construction evidence by metro
EMPLOYERS
Who Hires the People Who Build Data Centers?
Of the ten largest employers of electrical, cooling and mechanical data center roles, five are engineering, construction, real estate services or equipment companies. None of the ten largest employers of compute software roles falls into those categories. That list consists mainly of chipmakers and large technology companies, together with a job board and a bank.
Ten largest employers by postings
Electrical, cooling and mechanical roles
Compute software
Blue bars denote engineering, construction, real estate services and equipment companies. The employer type is a classification added for this data book. The compute software list includes chipmakers because some matched titles describe chip design. Recruiting firms and job boards post on behalf of other employers, so the underlying employer is not always identifiable.
Source: Draup job postings, US, September 2024 to September 2026.
FAQ
Who Builds Data Centers – The Talent Behind the AI Build-Out
We looked at which roles are growing fastest, how much experience employers ask for, where data center construction projects are concentrated, and which employers are hiring. The data shows demand rising fastest in the trades that most people don’t associate with AI. Demand rose in every metro, even where construction has not started. For talent leaders and economic developers, this is the workforce that decides how fast AI infrastructure gets built. Understanding where it is, how experienced it is, and who is competing for it is the first step in planning for it.
Who builds data centers in the US?
Electricians, cooling and mechanical specialists, construction and commissioning teams, and technicians. Five of the ten largest employers of electrical and cooling roles are engineering, construction, real estate services or equipment companies, such as Jacobs, CBRE, WSP and Johnson Controls.
Where are data centers being built?
Of the 22 US metros studied, 15 have data centers under construction and 5 have projects planned or proposed. Only two had none identified: Seattle, which adopted a moratorium, and New York, which paused state permitting.
What experience or training do data center jobs require?
Data center technician is the entry point: 84% of technician postings that state a minimum ask for three years of experience or less. Most electrical (69%) and construction (76%) postings ask for five years or more.
Which employers hire the people who build data centers?
For electrical and cooling roles, Google, Oracle, CBRE, Jacobs and AWS lead the top ten. None of the top ten employers of compute software roles is an engineering, construction or equipment company. They are mostly chipmakers and large tech companies.
How exposed is your own AI workforce plan?
The data book shows where AI workforce demand is growing. The diagnostic shows which roles and tasks in your organization AI changes first.
METHOD
Method, Sources and Limitations
Postings, experience, locations and employers. Figures are drawn from Draup's job-posting table in its data warehouse, restricted to postings located in the United States from September 2024 to September 2026, and were queried on October 16, 2026. Job titles were matched on the normalized title field. Counts are postings, not openings or hires, and may include reposts. Growth is the change in monthly postings between September 2024 and September 2026, with September 2025 as the midpoint. Shares of all US postings are a secondary measure.
Experience requirements. The share asking for three years or less is calculated from postings that state a minimum, so it includes postings that ask for three or more years.
Workforce profiles and experience. Figures come from Draup's professional profile snapshot, restricted to US profiles carrying the named role, queried on October 16, 2026. The share of data center technician profiles with four years or less is calculated from profiles with recorded experience and was queried on October 22, 2026. A profile may carry more than one role.
Talent size. Estimates come from Draup Talent Intelligence for the United States, queried on October 26, 2026, and combine Draup's professional profiles and job postings with Bureau of Labor Statistics and International Labour Organization data. Relative standard errors are 5% to 10%. The estimates were refreshed between January and October 2026, depending on the role.
Construction flags. Flags are based on Draup news signals in the Center Setup and Expansion category, captured between January and October 2026 and searched by metro, and on CBRE's North America Data Center Trends H1 2026 report, which gives megawatts under construction for its primary markets. Where Draup signals had no coverage, as in Des Moines and Omaha, public project trackers (Baxtel and Epoch AI) were used and are named in each metro's note. The flags rest on news reporting and have not been checked against permits.
Metro demand growth. For each metro, monthly data center postings in September 2026 were compared with September 2024, excluding technician titles because bulk postings distort them, using the same warehouse table and US filter as the other demand figures. Metros with small counts, such as Abilene, show very large percentage changes.
Limitations. Job titles are an imperfect guide to the work. Electricians hired directly by contractors may not carry "data center" in the title, so electrical roles are probably undercounted. The compute software group includes some titles that describe chip design. Total US postings varied from month to month, which is why shares of all postings are shown alongside raw counts. Growth rates for smaller metros rest on counts in the tens to low hundreds a month and move easily. Talent size is modeled, and profile data may over-represent experienced workers and under-represent skilled trades. Compensation, hiring difficulty and workforce supply by metro are not covered in this edition.
References
External pages behind the construction flags and the megawatt figures. Every link appeared in a search result on October 28, 2026. Sources for the Boston and Houston flags are being re-verified and are not listed. Draup's job-posting, profile, talent size and news-signal data are proprietary and have no public link.
Market and capacity reports
CBRE, North America Data Center Trends H1 2026, press release with a link to the full report. cbre.com
CBRE, North America Data Center Trends H1 2026, Dallas-Ft. Worth market page (more than 765 MW under construction, about 95% preleased). cbre.com.au
Data Center Frontier on the CBRE report (Northern Virginia 2,420.2 MW under construction). datacenterfrontier.com
WVTF on the CBRE report (Atlanta 2,882 MW under construction), October 20, 2026. wvtf.org
Construction flags, by metro
San Francisco Bay Area: NBC Bay Area, Microsoft breaks ground on a 48 MW San Jose campus. nbcbayarea.com
San Francisco Bay Area: Palo Alto Daily Post, Amazon's $2 billion Gilroy data center, August 11, 2026. padailypost.com
Greater New York: Phillips Lytle, New York State Issues Data Center Moratorium (Executive Order No. 62), July 14, 2026. phillipslytle.com
Greater New York: Davis Wright Tremaine, New York data center permitting pause under Executive Order No. 62. dwt.com
Dallas-Fort Worth: NBC 5 Dallas-Fort Worth, $430 million Colovore data center planned for Fort Worth, September 2026. nbcdfw.com
Dallas-Fort Worth: Baxtel, QTS DFW2-DC3, under construction. baxtel.com
Dallas-Fort Worth: Baxtel, DataBank DFW15. baxtel.com
Greater Atlanta: Atlanta Journal-Constitution, Coweta votes to turn an 800-acre forest into a $17 billion data center campus, April 2026. ajc.com
Columbus: WFMJ, AEP Ohio data center contracts total 17,861 MW, February 2026. wfmj.com
Columbus: WYSO, Meta's Prometheus data center in New Albany, January 2026. wyso.org
Austin: KUT, Taylor City Council approves the 664-acre Taylor Technology Campus, October 9, 2026. kut.org
Austin: Commercial Search, first power targeted for the first half of 2028. commercialsearch.com
Greater Seattle: Seattle City Council, emergency data center moratorium, June 9, 2026. council.seattle.gov
Phoenix: Business Wire, Prime Data Centers breaks ground on three buildings at its 240 MW Avondale campus, May 21, 2026. businesswire.com
Greater Chicago: Lake & McHenry County Scanner, Grayslake issues first building permit for the T5 campus, September 1, 2026. lakemchenryscanner.com
Denver: Colorado Newsline, Weld County commissioners approve the Global AI data center permit, September 10, 2026. coloradonewsline.com
Reno: Milbank, $3.8 billion Fleet Data Centers notes offering for a Storey County campus, February 26, 2026. milbank.com
Reno: Baxtel, Tract Virginia Highlands campus. baxtel.com
Richmond: Richmond BizSense, QTS 1,100-acre expansion that would add 17 buildings in Henrico, May 18, 2026. richmondbizsense.com
Richmond: Richmond BizSense, Tuckahoe Tech Park proposed in Goochland, June 11, 2026. richmondbizsense.com
Salt Lake City: Utah Public Radio, Box Elder County approves the 40,000-acre data center, May 6, 2026. upr.org
Salt Lake City: Baxtel, ServerDomes Global (Kaufman & Company dome data center campuses). baxtel.com
Des Moines: Baxtel, Meta Altoona campus. baxtel.com
Abilene: Epoch AI, OpenAI Stargate: where the US sites stand, April 17, 2026. epoch.ai
Abilene: Data Center Dynamics, Google-linked filings for two data centers in Haskell County. datacenterdynamics.com
Omaha: Epoch AI, Meta Sarpy data center (under construction), updated July 27, 2026. epoch.ai
Omaha: WOWT, Google proposes a Nebraska data center, March 13, 2026. wowt.com
Hermiston-Pendleton: GlobeNewswire, Sabey Data Centers celebrates going vertical at SDC Umatilla, July 22, 2026. globenewswire.com
Jackson: Office of the Governor of Mississippi, Amazon announces an additional $12 billion, April 9, 2026. governorreeves.ms.gov
Jackson: Mississippi Public Broadcasting, Amazon announces additional $12 billion for central Mississippi. mpbonline.org
Cheyenne: Cowboy State Daily, Microsoft to triple its Cheyenne footprint with a 3,200-acre purchase, April 14, 2026. cowboystatedaily.com
Cheyenne: Laramie Boomerang, Google outlines the $17 billion Project Tembo campus, September 12, 2026. wyomingnews.com
© 2026 Draup. All rights reserved.